Posillico Materials paving | Parking lotsPosillico Materials paving | Parking lots

paving /  Parking Lots

Parking Lots

  • The first step in building a lasting parking lot is to remove the existing blacktop.
  • After that is complete and the old asphalt is disposed of properly (see section on Recycling Services), the contractor inspects the sub-base and determines whether or not it needs to be removed and replaced.
  • If new sub-base is needed, 6 to 8 inches of R1 Type RCA will be installed and compacted.
  • After the base is compacted and settled, 2 to 3 inches of Type 3 binder is laid and compacted.
  • Following the installation of the binder, 1½ to 2 inches of Type 6 or Type 7 top is laid and compacted.
  • The final step is the line striping.
Read All Articles »

Products

Custom Materials
Recycled Clay
Recycled Aggreagate
Washed Sand
Reclaimed Asphalt Pavement
Commercial
State Approved Stone
Asphalt

Services

Trucking
Recycling
Asphalt Disposal
Contaminated Fill Disposal
Clean Fill Disposal
Paving

Submit A Project

Forms

Safety

About Us

News

FAQ

Wash Plant
Asphalt

Contact

MATERIALS
CALCULATOR
CHOOSE PRODUCT TYPE
ASPHALT
NON-ASPHALT
FEET
FEET
INCHES
CALCULATE
TOTAL CUBIC YARDS*
 
TOTAL TONS*
 
* The total above are for estimates only. Many factors can impact quantity.